RÍMAC RIVER DEFENSES - INTEGRAL SOLUTIONS (2024-2025)
Fluvial Hydraulics study for the Rímac river (in Lima).
Identifying weirs
The state of the hydraulic structures was assessed alongside the riverbank.
River roughness
The river roughness was estimated for different points of the river.
River roughness
The river roughness was estimated for different points of the river.
Identifying weirs
The state of the hydraulic structures was assessed alongside the riverbank.
River roughness
The Rímac river is a high steepness river with boulders and cobblestone.
Identifying structures
The state of the hydraulic structures was assessed alongside the riverbank.
Huachipa Water Intake
Huachipa Water Intake is one of the main intakes for superficial water.
Huachipa Water Intake
Huachipa Water Intake is one of the main intakes for superficial water.
Team pictures
CSIR Office
Hydraulic team focusing on delivering the design alternative within the project budget.
Team Bridges
Geotechnics, structural and hydraulic leaders of the bridge assessment for the project.
Futball break
Team futball match.
SAN IDELFONSO AND SAN CARLOS GULLIES (2024)
Further optimization strategies were proposed to the initial design of the project.
Convergent walls
Preliminar non-newtonian turbulent model was simulated to assess the effectiveness of modifying a stilling basin in a channel of covergent walls.
Bingham model
A non-newtonian Bingham model was used in the multiphase simulation.
Tunnel entrance
The flow at the tunnel entrance was simulated in detail for the design case.
TUMBES RIVER DEFENSES - INTEGRAL SOLUTIONS (2022-2024)
Selected pictures of the monitoring in the construction phase.
Supervision
Supervision of the works in Corrales gully.
Field measurements
Identification of water marks due to flood event.
Field measurements
Identification of water marks in the pilar of the Francos bridge (Tumbes).
Selected pictures from the design phase
Groynes analysis
Groynes riverbank protection was assessed by numerical simulations.
Mitigation zones
The resilient design approach was incorporated by categorizing the risk levels for different regions.
Francos Bridge
Field studies near the Francos Bridge as this was a critic constraint in the project.